Tuesday, May 25, 2010
Monday, May 24, 2010
water
Water supply
550 ppd X 60 gpd = 33000 gpd
Water runoff
thanks to the parking lot drainage problems can occure; a retention pond is often used to control the flow of water. But, there is a pond already on the property so drainage due to the addition of a parking lot should be just fine.
Waste Water will also be simple considering we are near the school, there has to be a sewer system alreasy run out this direction. We will be able to link our system to it and just pay for the usage.
550 ppd X 60 gpd = 33000 gpd
Water runoff
thanks to the parking lot drainage problems can occure; a retention pond is often used to control the flow of water. But, there is a pond already on the property so drainage due to the addition of a parking lot should be just fine.
Waste Water will also be simple considering we are near the school, there has to be a sewer system alreasy run out this direction. We will be able to link our system to it and just pay for the usage.
estimated cost
The actual cost of the building i created is hard to judge; however if I had to estimate the cost I would have to put it around $700,500-1000000. The main reason why i believe this would be so expensive is that the floor to the first floor is made from one solid piece of tinted glass. This is a flippin awesome aesthetic feature that will make people want to come back to the White Knight over and over again, but it also increases price.